Contract 23. Excavation for water main west of East Henrietta Road. "This photo is looking south; the north half was completed (exc.) on Sept. 14th, and on 15th 72' of 24" C1 Pipe were laid in same. On 16th a cave-in occurred nearly filling the trench; the cave-in is clearly shown here on right side of trench in foreground."
Identifier
NYSA_11833-97_C023_V1_7561
Date Original
September 23 1910
Source
New York State Archives. New York (State). State Engineer and Surveyor. Barge Canal construction photographs. 11833-97. Contract 23, Volume 1, p. 20, negative 7561.
RightsThis image is provided for education and research purposes. Rights may be reserved. Responsibility for securing permissions to distribute, publish, reproduce or other use rest with the user. For additional information see our